InfinityBurnout FurnacesTMOPERATOR’S MANUAL115V, 60Hz Models
1. Turn the power switch on.2. Press PROGRAM NUMBER. Use to display the desired program number (P1 - P30).3. Press ENTER / REVIEW to select th
1. Follow One Stage Program, Steps 1 - 6.2. Press ENTER / REVIEW. STAGE 1 light turns off, STAGE 2 and HEAT RATE lights turn on. Main Display show
1. Follow Two Stage Program, Steps 1 - 4.2. Press ENTER / REVIEW. STAGE 2 light turns off, STAGE 3 and HEAT RATE lights turn on. Main Display show
OPERATIONPROGRAM AND OPERATE - FOUR STAGE PROGRAM (Figure 1)1. Follow Three Stage Program, Steps 1 - 4.2. Press ENTER/REVIEW. STAGE 3 light turns of
1. Turn the power switch on.2. Press PROGRAM NUMBER.3. Press to select the program number to be reviewed. The PROGRAM NUMBER (P1 - P30) wil
1. To identify which program is running, press PROGRAM NUMBER.NOTE: The program number cannot be changed using while the program is running.
NIGHT TIMEDELAY STARTOPERATIONSAMPLE ONE STAGE PROGRAM(To be completed and ready to cast in 24 hours)HEAT RATETEMPHOLD TIMESTAGE 1STAGE 2STAGE 3STAGE
To start immediately, press START / STOP.Follow the same programming procedures if a three or four stage program is desired.Press NIGHT TIME (DELAY ST
ERROR CODESNOTE: “Beeps” occur when the Error Code appears on the Main DisplayERRORCODEDESCRIPTIONPROBABLE CAUSEINVALID ENTRYERROR: STAGE,HEAT RATE
ERROR CODESEERRRROORRCCOODDEEDDEESSCCRRIIPPTTIIOONNPPRROOBBAABBLLEE CCAAUUSSEESHORTED THER-MOCOUPLE ORDEFECTIVE HEATERPLATESOccurs if the thermocouple
1Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2Warrant
19CAUTION: The INFINITY should be serviced only by qualified service technicians. Be sure tounplug the power cord and wait for the furnace to cool b
201. If a power failure occurs, the Infinity memorizes the conditions prior to the loss of power. When the power returns, the Infinity returns to
1. Remove the back panel of the furnace.2. Remove the nuts which hold the heating plate wires to the power terminals and straighten the heating plate
INFINITY MINFINITY L22Figure 4INFINITY WITH UPPER REAR PANEL REMOVEDRear Insulating PanelThermocoupleThermocouple ClampCeramic InsulatingBushingInsula
1. Remove the front panel (Figure 5).2. Note and record the color and location of each wire on the thermocouple terminals located on the MainPC Board.
Figure 5AOTHER COMPONENTS24Figure 5INFINITY WITH FRONT PANEL / MAIN PC BOARD REMOVED
1. Remove the bottom front panel and the upper and lower rear panels of the furnace. (Note the position of the vent louvers on the rear panels.)2. Not
FIELD SERVICEREPLACEMENT OF THE TRIAC (PN 15475)261. Remove the lower rear panel (Figure 2).2. Note and record the color and location of each of the t
27SPARE PARTS LISTDESCRIPTION 115VPower Cord Kit-Japan & U.S. 15288Main PC Board15500-041Heater Jumper 33130Ceramic Front Section 15292Rear Insula
28SPARE PARTS LISTDESCRIPTION 115VPower Cord Kit-Japan & U.S. 15289Main PC Board 15500-541Heater Jumper 33130Ceramic Front Section (Set of 2) 1529
Thank you for purchasing an Infinity Burnout Furnace. We have designed and manufactured this furnace using the latest in microcomputer technology to
PROGRAM CARD FORMSSTAGE 1STAGE 2STAGE 3STAGE 4HEAT TEMP HOLDRATE TIMEProgram # Metal(s)STAGE 1STAGE 2STAGE 3STAGE 4HEAT TEMP HOLDRATE TIM
PROGRAM CARD FORMSSTAGE 1STAGE 2STAGE 3STAGE 4HEAT TEMP HOLDRATE TIMEProgram # Metal(s)STAGE 1STAGE 2STAGE 3STAGE 4HEAT TEMP HOLDRATE TIM
Jelrus International, a division of Air Techniques Inc., has been a leading manufacturer ofdental laboratory equipment essential to the fabrication of
SPECIFICATIONSINFINITY M INFINITY LElectrical115V 60Hz 1150W115V 60Hz 1610WCapacity8-1 3/4” rings or 2-3” rings15-1 3/4” rings or5-1 3/4” rings and 3-
DISPLAYDESCRIPTION1. NIGHT TIME Press to start a delayed program. The number entered is the time (DELAY START) required for the program to be COMPLET
5Figure 1INFINITY M AND L IDENTIFICATION 13101198765124321FrontPanelHeatingChamberVentTubeKEY PARTS IDENTIFICATION AND EXPLANATIONKeep clear 6” zonear
KEY PARTS IDENTIFICATION AND EXPLANATIONLOWER BACK PANEL (Figure 2)Figure 2INFINITY LOWER BACK PANEL6DISPLAY DESCRIPTION1. Power Cord AC power cords a
1. Unpack the contents of the box. Remove the following materials:A. Vent Tube - Remove from bubble wrap and insert in hole on top of furnace.B. Calib
When a program is completed, 20 "beeps" sound every 15 minutes to remind the operator that the material is ready to cast.1. Be sure the Inf
Komentarze do niniejszej Instrukcji